DRA Global Limited is a multi-disciplinary engineering, project management, and operations management group predominantly focused on the mining and minerals resources sector.
Water is essential for the mining industry. It is used in various activities associated with the extraction phases: ore processing, dust control, sludge transportation, as well as employees’ needs. A Water treatment plant is needed to manage its wastewater and process residue to comply with the local Environmental Protection Agency’s requirements for discharge into the ecosystem.
Stephen Narh Wayoe, WEC’s CEO, said, “The company is delighted to have been awarded this SMPP installation contract. The contract is an exciting opportunity for WEC and the confirmation of being the Trusted Partner in Engineered Project Solutions. The scope involves the on-site fabrication and installation of free-issued HDPE piping and installation of structural steelwork, mechanical equipment, piping & platework.