Detailing design, supply, shop fabrication, corrosion protection, transportation, structural and mechanical equipment installation, handrails & gratings, and heavy lift cranage.
WEC fast-tracked this project to ensure our client’s critical operations were achieved. Major delays in material supply were mitigated by WEC through airfreighting all steelwork materials from South Africa to Ghana for local fabrication.
This project involves replacing the three gantries and trestles of the stockpile feed conveyor (CV01) to accelerate stockpile processing while maximising resource value.